Critical-path planning for projects that cannot slip.
Independent planning and scheduling consulting built on Primavera P6 — from tender to handover. Based in Munich, working across German infrastructure and construction.
Planning expertise across the full project lifecycle
From the first tender schedule to the final claim — a single, accountable point of planning competence for your project.
Planning & scheduling in P6
Structured project schedules, baselines and critical-path logic — built and maintained in Primavera P6.
Bid & tender preparation
Schedules, construction-sequence concepts and time-impact reasoning that strengthen your tender.
Schedule analysis & delay claims
Forensic schedule analysis, as-planned vs. as-built, and substantiated delay and disruption claims.
Project controls & monitoring
Progress tracking, earned-value reporting and early-warning indicators that keep delivery on course.
Interim planning support
Embedded planning capacity for your project team — on call when deadlines and resources peak.
P6 coaching & training
Practical Primavera P6 training and coaching, tailored to your team and your projects.
A method built on the critical path
The standard for complex programmes
Primavera P6 is the reference tool for large, multi-party construction programmes. It makes dependencies, float and risk visible — and, when it matters, defensible.
Every engagement results in a schedule your team — and your client — can trust and act on.
Understand the scope
Contract, scope, constraints and interfaces — read closely before a single bar is drawn.
Structure the programme
A clean WBS, sound logic, realistic calendars and resources — a schedule that holds together under scrutiny.
Steer & monitor
Baselines, regular updates and variance analysis — so deviations are caught early, not at handover.
Defend the timeline
Clear evidence and forensic analysis when delays or disruptions need to be substantiated and claimed.
Where this planning belongs
Project types where structured P6 planning makes the difference between a schedule on paper and a programme that delivers.
Rail & transit infrastructure
DB · U-Bahn · S-Bahn
Roads & bridges
Civil & structural
Public & civic buildings
Stadt München · Freistaat
Water & utilities
Networks & plants
Residential & commercial
Large-scale developments
Industrial & plant
Process & production
Independent planning, from Munich
“A schedule is only worth what it can withstand. My work is to build programmes that hold — and to prove it when they are challenged.”
I am a civil engineer specialised in the planning and scheduling of major construction projects. Over years on large, multi-party programmes I have built and defended schedules in Primavera P6, prepared winning tenders, and helped teams keep complex projects on track. I work independently from Munich, in German and English.
- Civil engineering (Dipl.-Ing. / M.Sc.)
- Primavera P6 specialist
- Takt & sequence planning
- Claims management (VOB/B)
- Bid & tender planning
- Based in Munich, Germany
Working together
Yes. Engagements range from a short, focused schedule review to embedded planning support over an entire project phase — whatever the situation requires.
General contractors and construction firms, infrastructure and civil engineering companies, public agencies, and engineering and planning offices — primarily across Germany.
Primavera P6 is my primary tool and core specialism. I also work with MS Project and can integrate planning into your existing reporting and controls environment.
Yes. I prepare forensic schedule analyses, as-planned vs. as-built comparisons and the substantiated documentation needed to support delay and disruption claims under VOB/B.
German and English — including schedules, reports, correspondence and client workshops in either language.
Munich. I work with clients across the Munich metropolitan region and throughout Germany, on site and remotely as the project requires.
Let's plan your next project
Tell me about your project and where the schedule pressure is. I'll come back to you within two working days.